Verify that the updates from changing to pull request work as follows. This should be done after the fix for PR instead of PR targets is merged: **Test Plan** - [ ] Open a PR from a fork and verify the Documentation workflow builds successfully - [ ] Verify the Documentation deploy workflow triggers after the build completes and deploys the Surge preview - [ ] Verify the PR comment with preview/a11y links is posted - [ ] Verify the issue_comment path still works (re-trigger via bot comment) - [ ] Verify the release workflow (workflow_call) still builds and deploys docs --- **Jira Issue:** [PF-4563](https://redhat.atlassian.net/browse/PF-4563)
Verify that the updates from changing to pull request work as follows. This should be done after the fix for PR instead of PR targets is merged:
Test Plan
Open a PR from a fork and verify the Documentation workflow builds successfully
Verify the Documentation deploy workflow triggers after the build completes and deploys the Surge preview
Verify the PR comment with preview/a11y links is posted
Verify the issue_comment path still works (re-trigger via bot comment)
Verify the release workflow (workflow_call) still builds and deploys docs
Jira Issue: PF-4563