Repository navigation
Commit 0455861
authored
test: drain every due trigger after scheduler fault recovery (#1327)
The fault test checked recovery with one scheduler cycle, which evaluates at
most 100 due triggers. With 400 triggers, a slow runner that crossed a minute
boundary during recovery left the rest without their latest tick. Run enough
cycles to drain every trigger due at the settled time.1 parent a788b94 commit 0455861
1 file changed
Lines changed: 6 additions & 3 deletions
| Original file line number | Diff line number | Diff line change | |
|---|---|---|---|
| |||
619 | 619 | | |
620 | 620 | | |
621 | 621 | | |
622 | | - | |
623 | | - | |
624 | | - | |
| 622 | + | |
| 623 | + | |
| 624 | + | |
| 625 | + | |
| 626 | + | |
| 627 | + | |
625 | 628 | | |
626 | 629 | | |
627 | 630 | | |
| |||
0 commit comments