Skip to content

Implement post-merge on-prem operability and small-team follow-ups (M017–M023) - #8

Merged
dbowm91 merged 63 commits into
mainfrom
plans/on-prem-post-merge-operability
Oct 16, 2026
Merged

dbowm91 merged 63 commits into
mainfrom
plans/on-prem-post-merge-operability

Conversation

@dbowm91

@dbowm91 dbowm91 commented Oct 15, 2026 •

Copy link
Copy Markdown
Contributor

Implemented

This PR implements the post-PR #7 on-prem user-access and small-team work across M017–M023. It includes managed personal credentials, local operator status and headless user administration, secure login transport, default member-profile provisioning, hard-budget client compatibility, and optional bounded short-window admission fairness. The fairness limiter is disabled by default and returns a distinct pre-body 429 with Retry-After when configured.

The PR adds SQLite migration 0063 for the nullable default member profile. M023 adds no schema migration. The final integration pass also corrected eggpool onboard so it does not create a legacy shared server key after administrator initialization.

Verification

  • Hosted check, Linux installer, and macOS installer workflows passed on 83c0779ae4776a6b9d4d82571c7255bcb71246d6.
  • Local formatting, strict Clippy, no-default check/Clippy, Ruff, Pyright, the focused qualification tooling suite (44 passed), and the onboarding regression test passed.
  • The modified release binary (d7bec9bf…) completed 27 no-rule ordinary-server runs on Ubuntu 24.04.5 / ext4 / Samsung SSD 980 NVMe. The 49-principal single-request control matched M002 at p95/p99 61/81 ms.
  • Three active-throttle runs each sent 1,000 requests at concurrency 16 and admitted exactly 5, returning the distinct rate-limit 429 for the remaining 995. Median observed rate was 1,092 requests/s; raw evidence is under artifacts/qualification/on-prem-user-access/.

M023’s prior ordinary-Linux measurement condition is closed. These synthetic, host-specific measurements do not establish a general capacity or latency SLA, and do not claim 50 simultaneous inference requests.

dbowm91 and others added 30 commits October 15, 2026 11:35
@dbowm91 dbowm91 changed the title Plan post-merge on-prem operability and small-team follow-ups (M017–M023) Implement post-merge on-prem operability and small-team follow-ups (M017–M023) Oct 16, 2026
@dbowm91
dbowm91 marked this pull request as ready for review October 16, 2026 05:58
@dbowm91
dbowm91 merged commit e48f021 into main Oct 16, 2026
3 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant