Expand Up @@ -21,8 +21,11 @@ The severity is used to decide how much we invest in preventative measures, dete
### Timeline (GMT/UTC)

18:46 First automated alert to developers

19:09 First user email to support address

21:30 Investigation found an expired token for Microsoft users, which needed refreshing

21:48 Problem solved

### Analysis
Expand All @@ -33,10 +36,52 @@ The cause of the problem stems from switching to a new auth system 12 months ago

### Actions

Calendar events have been set to refresh tokens in advance of their expiry. An additional developer is being recruited.
Calendar events have been set to refresh tokens in advance of their expiry. An additional developer is also being recruited.

N=0.24, effect = 4, duration = 3. Severity = 2.88 (SIGNIFICANT)

## 2026 Oct 27th: Partial Outages (Severity: SIGNIFICANT):

### Timeline (GMT/UTC)

09:12 Singular task hit 100% CPU Utilisation and users experienced instability.

09:28 Unhealthy task was ended, and a new task started automatically.

09:39 CPU Utilisation returned to normal

We also detected significant periods of loading and slow responses in the evenings on 30/10/26, 31/10/26, 2/11/26. In those periods, the automated response was more rapid and the effects were less severe.
Comment thread
timothee-alby marked this conversation as resolved.
Resolved

### Analysis

1. Scaling of servers ('tasks') comprises a minimum number and additional automatically started tasks to meet higher demand. The minimum number is scheduled to be higher during busy periods for higher resilience.

2. The period in question was in the hour before a scheduled increase in the minimum, so was more vulnerable to failures to autoscale.

3. Autoscaling relies on sensing that a task is overloaded. In this case, despite the ~100% CPU utilisation, the task was not recognised by the automated systems as reaching capacity. Therefore, rather than the expected ~2 minutes to expand capacity, it took 16 minutes for an automated response. This is the reason for an extended period of instability.

4. For the other incidents (other than the first one), memory limits were the cause for slow responses.


### Actions

All of the following have been done to prevent future events:

1. Extend the scheduled busy periods, i.e. times with an increased base number of tasks, to start one hour earlier.

2. Double the memory in each task.

3. Stricter measures of task health for faster and more reliable automated scaling responses.

4. Stricter and more accurate memory thresholds to trigger automated scaling.

5. New monitoring of slowdowns in event loops, for better detection of issues.

6. Common highest-memory-usage DB queries were optimised to reduce typical memory loads on the tasks.

N~2, effect = 3, duration = ~0.5. Severity ~3 (SIGNIFICANT)


## 2025 December 4th: Brief DB outage (Severity: LOW):