Skip to content

AHR-QPU-03 three-prime curvature tomography and Bianchi reconstruction - #267

Draft
patrickdugan wants to merge 3 commits into
mainfrom
research/ahr-qpu-03-curvature
Draft

patrickdugan wants to merge 3 commits into
mainfrom
research/ahr-qpu-03-curvature

Conversation

@patrickdugan

@patrickdugan patrickdugan commented Nov 23, 2026 •

Copy link
Copy Markdown
Owner

Execution preflight

HOLD pending approval of the refreshed manifest. IBM still reported 515 free Open Plan seconds at 23:19 Singapore time on 23 November 2026 and ranked Kingston qubits 67, 68, and 69 first. IBM reported calibration timestamp 22:46:22 at preflight. The approved manifest was bound to 22:34:13. The approved run was held. No Q3 job was submitted.

Recompilation reproduced the exact same QPY bytes, measurement mappings, and return predictions. The refreshed proposal retains 48 circuits at 4,096 shots each and the 106-second cap. The new manifest SHA-256 is 52bd98145e5ef2be205f5128097ed9101af3797c8b4662341a39957e6dfa5f6f. Twelve local tests passed.

Live-calibration simulation

  • Exact synthesis with SABRE used at most 29 CZ gates, depth 127, and a 5.72 µs native critical path. All proposed circuits passed the registered accuracy and resource thresholds.
  • The calibrated likelihood at t = 2.0 achieved 2.08° worst-face RMSE, 93.9% lowest marginal face coverage, and 94.9% joint chord coverage across 1,000 held-out trials at 4,096 shots per setting.
  • The archived proposal includes the exact QPY and digests, per-case physical readout maps, repeat calibration and allocation evidence, and simulated controls. Ten local tests passed, including the live relaxation-channel serialization and both ISA archive checks.

Baseline

Replay the merged Q2 evidence from PR #262 against the original baseline in draft #254. The Q2 counts reproduce +38.9037° and −42.8600°, the prespecified acceptance, and the tree control. The separate FakeFez receipt preserves the historical simulation, and the integer cochain and direct-matrix checks validate all six Q3 selectors and the five-chord reconstruction.

Refreshed exact manifest · Refresh evidence · Live simulation results · Hardware gate

Copy link
Copy Markdown
Owner Author

AHR-QPU-03: credential-source scope confirmation

The requester explicitly approved reuse of their existing local IBM API-key export for a read-only AHR-QPU-03 account and backend inspection. The approved source is the existing Windows Downloads export identified in the conversation. This is credential reuse for inspection, not a request to issue a new key.

Authorized operations: authenticate to IBM Quantum from the user's local machine; inspect the currently active Open/free Plan, remaining allocation, accessible backend(s), live calibration timestamp and properties, and candidate connected physical qubit triples; save sanitized, non-secret balance/calibration metadata for updating the simulation and hardware gate.

Limits: never publish or copy the credential file, print its contents or token, add it to Git, transmit it to GitHub Actions, or log it. Do not modify or rotate the key. Do not submit a QPU job, invoke Sampler or another quantum primitive, create a paid instance, or approve the 48-circuit Q3 manifest. Preserve HOLD for hardware execution until fresh calibration, budget verification, and separately authorized exact manifest. This comment records the read-only scope only. Access must be performed by the locally authorized operator; the GitHub connector cannot read the Windows Downloads file.

Reference: draft PR #267, where backend_snapshot.py is the read-only inspection entrypoint.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant