Skip to content

cortex: EP check-in 2026-09-24 — ep_toy_gaussian wave 1 failed, slope_hierarchy_scale 343299 stale - #42

Merged
github-actions[bot] merged 1 commit into
mainfrom
claude/ep-checkin-2026-09-24
Sep 24, 2026
Merged

github-actions[bot] merged 1 commit into
mainfrom
claude/ep-checkin-2026-09-24

Conversation

@Jammy2211

Copy link
Copy Markdown
Contributor

Ledger-only check-in (projects/ only), evidence gathered 2026-09-24.

ep_toy_gaussian

  • 342639 failed: one_by_one completed 50/50 in 319 s (naive parent 52.470 ± 1.260, deconvolved scatter 3.142); NUTS OUT_OF_MEMORY at the 8 GB SBATCH cap during window adaptation, no nuts.json.
  • 342640_[0-2] failed: all three EP repeats crashed OSError [Errno 24] Too many open files after ~126 Dynesty factor fits (Pool(1) per single-core fit on RAL mirror e354dbb6b). Fixed by PyAutoFit#1632 + #1634; RAL mirror now a73684012; local fd count flat at 7 across 15 factor searches.
  • Note: per-search overhead profile (2.45 s = 1.47 run_nested + 0.98 wrapper) with Mind prompt draft/refactor/autofit/ep_factor_search_wrapper_overhead.md.
  • Now: wave 2 needs a human go, a new sample name (e.g. n50_seed42_w2) and NUTS memory > 8 GB.

slope_hierarchy_scale

  • 343299 finished (wall 5:20): dataset factors all SUCCESS, one JIT compile per factor search; hierarchical factor 0/50 SUCCESS (27 BAD_PROJECTION + 23 FAILURE), parent = prior.
  • Now: moment-matching cure (draft/feature/autofit/ep_hierarchical_scatter_moment_matching.md) is the gate — human decision.

cortex check: OK.

🤖 Generated with Claude Code

…_hierarchy_scale 343299 stale

- ep_toy_gaussian: 342639 failed (one_by_one 50/50; NUTS OOM at 8 GB),
  342640_[0-2] failed (EMFILE, fixed by PyAutoFit#1632/#1634); overhead
  profile note; Now = wave 2 awaits a human go under a new sample name.
- slope_hierarchy_scale: 343299 finished (wall 5:20) with the
  hierarchical factor 0/50 SUCCESS (27 BAD_PROJECTION + 23 FAILURE);
  Now = moment-matching cure is the gate.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
@github-actions
github-actions Bot merged commit aa39279 into main Sep 24, 2026
2 checks passed
@Jammy2211
Jammy2211 deleted the claude/ep-checkin-2026-09-24 branch September 28, 2026 16:40
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant