You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
AHR-QPU-01 signed holonomy pilot and Q3 curvature simulation - #254
IBM job dc1vksqnj2vs73dfu0n0 completed on ibm_fez, qubits 9 and 10. All 36 circuits returned 2,048 shots each, for 73,728 total. IBM reported the same refreshed calibration at job start and for the last execution chunk.
The primary complex harmonic at (t=1.6) passed its predeclared criterion. The QPU measured Z₄ = −0.15430 − 0.19873i, compared with the exact value of −0.15494 − 0.20311i. Relative to the independently measured reference, the forward phase was +38.90° (95% interval +23.43° to +54.38°) and the reversed phase was −42.86° (95% interval −58.46° to −27.26°). The tree control’s joint interval includes zero.
IBM charged 21 seconds to the free Open Plan allocation. The post-run balance was 515 seconds. Q3 remains simulation-only.
Simulation and circuit preparation
Add the executable AHR-QPU-01 four-offset IBM pilot and its independent spectral and direct-exponential references. The audit reproduces the AHR-07 harmonic fixture, including third-harmonic aliasing and the failure of the unicyclic identity on the intact cube.
Record the exact versus Suzuki–Trotter ISA comparison, reduced live Aer noise snapshot, equal-total-shot exhaustive comparison, Fisher bound, and fixed-seed timing and uncertainty receipts.
Simulate the six AHR-08 Q3 face measurements, reconstruct the AHR-09 tree-gauge chords, project onto the compatible Bianchi subspace, and quantify the cost of sharing a zero-offset preparation.
Verification
Ten package tests and Ruff passed. The AHR-01, AHR-07, and AHR-08 upstream verifiers passed during preparation.
The receipts archive all 36 raw count dictionaries, the physical ISA circuits, the exact and calibrated Aer predictions, and the execution calibration and ordering. Portable calibration and QPY checksums were verified.
At the Q2 primary time, the calibrated Aer angular RMSE was 2.01° at 2,048 shots per setting. Exact synthesis met both predeclared accuracy thresholds and had the lowest aggregate depth.
Q2 hardware evidence is now preserved on current main via merged PR #262 (merge 2efb49fe12b1dfc46434793042efc6daddda16e2). The 11 original hardware receipt Git blobs, the Q2 report, an offline count/checksum replay, and path-scoped CI were integrated without overwriting the separately merged simulator from PR #255. The dedicated replay and repository-wide CI passed. This original draft PR remains available as the pinned source-code provenance of IBM job dc1vksqnj2vs73dfu0n0. Q3 execution remains subject to a separate approval gate.
Recovery branch opened as draft PR #266 from current main. It isolates the original Q2 IBM execution/compiler/collection, statistics, Q3 prototype, and ten historical tests under ibm_qpu_01/recovered_q2/, with added offline receipt replay and fake-job interruption recovery. The experiment.py submission gate now requires fresh manifest-hash-bound approval plus explicit Open Plan/QPU confirmations. All original hardware Q2 receipts remain immutable in merged PR #262. Will retain this historical PR until #266 passes CI and completes review.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Approved IBM Q2 pilot
dc1vksqnj2vs73dfu0n0completed onibm_fez, qubits 9 and 10. All 36 circuits returned 2,048 shots each, for 73,728 total. IBM reported the same refreshed calibration at job start and for the last execution chunk.Simulation and circuit preparation
Verification
Q2 hardware report · Hardware receipts · Simulation results · Reproduction · Hardware gate