Skip to content

[10/29] Model configured avalanche noise and warn at detector exposure limits - #30

Merged
Yashvi-Sharma merged 3 commits into
review/xs-09-slit-projectionfrom
review/xs-10-detector-operating-points
Nov 5, 2026
Merged

Yashvi-Sharma merged 3 commits into
review/xs-09-slit-projectionfrom
review/xs-10-detector-operating-points

Conversation

@baileyji

@baileyji baileyji commented Oct 23, 2026 •

Copy link
Copy Markdown
Member

Add configured compound-Poisson avalanche photon variance with separate dark/read terms. Report expected charge per integration and warn at the configured usable well without altering DIT or NDIT.

Part 10/29 of the Caltech review series. Review the diff against review/xs-09-slit-projection; the final destination is main.

Merge after series 09: scopesim.

Review focus: scopesim/effects/electronic; detector metadata.

Validation: Covered by the 249-case numerical/operating-point run. Final spectroscopy production tree matches source 2780412 exactly.

Source commits/snapshots: e2cefad8.

Use a merge commit to preserve the stack ancestry and pinned commits. After this merges, retarget the next PR in this repository to its default branch. Do not squash/rebase an earlier stack entry without rebuilding its descendants and dependency pins.

@Yashvi-Sharma Yashvi-Sharma left a comment

Copy link
Copy Markdown
Collaborator

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM, isolated enough

…zimager-throughput

[27/29] Apply imaging branch throughput before wavelength integration
@Yashvi-Sharma
Yashvi-Sharma merged commit 72e6656 into review/xs-09-slit-projection Nov 5, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants